26th March 2018 Evening Talk in IEM By Project Fire
This presentation will focus on: HOW TO SAVE WATER, ENERGY, MANPOWER AND UNTIMATELY MONEY IN THE TESTSTING, MONITORING & MAINTENANCE OF SPRINKLER SYSTEMS - new technologies available for flow switch and alarm valve testing and live sustainable modifications to sprinkler systems, saving significant amounts of water, energy & man hours leading to substantial financial savings in both capital and operational expenditure. Making buildings better for the environment and all stakeholders for their entire lifespan.
The presentation will further touch on:
- Addressable flow switch and alarm valve testing and monitoring.
- Efficient Construction (POD’s)
- Pre-action addressable sprinkler heads
- Live sprinkler modifications
- Live sprinkler inspections
The presentation will further touch on:
- Addressable flow switch and alarm valve testing and monitoring.
- Efficient Construction (POD’s)
- Pre-action addressable sprinkler heads
- Live sprinkler modifications
- Live sprinkler inspections